https://en.wikipedia.org/wiki/Alenia_C-27J_Spartan
The Alenia C-27J Spartan is a military transport aircraft developed and
manufactured by Leonardo's Aircraft Division (formerly Alenia Aermacchi until
2016). It is an advanced derivative of Alenia Aeronautica's earlier G.222 (C-27A
Spartan in U.S. service), equipped with the engines and various other systems
also used on the larger Lockheed Martin C-130J Super Hercules. In addition to
the standard transport configuration, specialized variants of the C-27J have
been developed for maritime patrol, search and rescue, C3 ISR (command, control,
communications, intelligence, surveillance and reconnaissance), fire support and
electronic warfare and ground-attack missions.
In 2007, the C-27J was selected as the Joint Cargo Aircraft (JCA) for the United
States military; these were produced in an international teaming arrangement
under which L-3 Communications served as the prime contractor. In 2012, the
United States Air Force (USAF) elected to retire the C-27J after only a short
service life due to budget cuts; they were later reassigned to the U.S. Coast
Guard and United States Special Operations Command. The C-27J has also been
ordered by the military air units of Australia, Italy, Greece, Bulgaria,
Lithuania, Mexico, Morocco, Romania, Peru, and Slovakia.
In 1995, Alenia and Lockheed Martin began discussions to improve Alenia's G.222
using C-130J's glass cockpit and a more powerful version of the G.222's T64G
engine and four-blade propellers. In 1996, a program began on an improved G.222,
named C-27J; it used a U.S. military type designation based on the G.222's C-27A
designation. In 1997, Alenia and Lockheed Martin formed Lockheed Martin Alenia
Tactical Transport Systems (LMATTS) to develop the C-27J. The design changed to
use the C-130J Super Hercules's Rolls-Royce AE 2100 engine and six-blade
propeller. Other changes include a fully digital MIL-STD-1553 systems and
avionics architecture, and an updated cargo compartment for increased
commonality. The C-27J has a 35% increase in range and a 15% faster cruise speed
than the G.222.
November 2006, the C-27J completed the U.S. Department of Defense's Early User
Survey evaluations, having flown a total of 26 hours and surpassed all
requirements. GMAS also announced that the C-27J will be assembled at a facility
at Cecil Field, Duval County, Florida. The JCA's final selection was expected in
March 2007, however it was postponed until 13 June 2007, when the Pentagon
announced the award of a US$2.04 billion contract for 78 C-27Js, including
training and support, to GMAS.
On 22 June 2007, Raytheon formally protested the JCA contract award for the
C-27J. On 27 September 2007, the GAO announced that it had denied Raytheon's
protest, thereby allowing the Pentagon to proceed with procurement; at this
time, the U.S. Army had requirement for up to 75 aircraft in the Army National
Guard; the Air Force had a requirement for up to 70 aircraft in the Air Force
Special Operations Command and the Air National Guard. The first C-27J was to be
program in June 2008; the first flight of a U.S. C-27J occurred on 17 June 2008.
Role
Military transport aircraft
National origin
Italy
Manufacturer
Alenia Aeronautica
Alenia Aermacchi
Leonardo
First flight
24 September 1999
Introduction
October 2006 (Italy)
Status
In service
Primary users
Italian Air Force
United States Coast Guard
Royal Australian Air Force
See Operators below for others
Produced
Number built
82 as of 30 June 2016
Developed from
Aeritalia G.222
The U.S. Air Force performed the C-27J's first combat deployment in Summer 2011.
In August 2011, two C-27Js flown by Air National Guard aircrews, augmented with
Army National Guard personnel, began operations at Kandahar Air Field,
Afghanistan. Between August 2011 and June 2012, the C-27Js of the 179th Airlift
Wing, followed by the 175th Wing executed more than 3200 missions transporting
over 25,000 passengers, and 1400 tons of cargo. Via tactical control of the
C-27Js, the U.S. Army was able to employ helicopters more efficiently, splitting
missions between the two platforms based on their relative strengths.
On 26 January 2012, the Department of Defense announced plans to retire all 38
USAF C-27Js on order due to excess intratheater airlift capacity and budgetary
pressures; its duties are to be met by the C-130. In February 2012, Alenia
warned that it would not provide support for C-27Js resold by the US to
international customers in competition with future orders. On 23 March 2012, the
USAF announced the C-27J's retirement in fiscal year 2013 after determining
other program's budgetary needs and requirement changes for a new Pacific
strategy. The cut was opposed by the Air National Guard and by various
legislators.
In July 2012 the USAF suspended flight operations following a flight control
system failure. By 2013, newly built C-27Js were being sent directly to the
since 2007, with 16 delivered by the end of September 2013; 12 had been taken
out of service while a further five were to be built by April 2014 as they were
too near completion to be worth cancelling. Budget cuts motivated the divesture;
a C-27J allegedly costs $308 million over its lifespan in comparison with a
C-130's $213 million 25-year lifespan cost.
In November 2012, the C-27J deployed for its first domestic mission,
contributing to the Hurricane Sandy relief effort.
Specifications (C-27J)
General characteristics
Crew: Minimum two: pilot, co-pilot (plus loadmaster when needed)
Capacity: 60 troops or 46 paratroops or 36 litters with 6 medical personnel
Cargo compartment: width 3.33 m X height 2.25 mLength: 22.7 m (74 ft 6 in)
Wingspan: 28.7 m (94 ft 2 in)
Height: 9.64 m (31 ft 8 in)
Wing area: 82 m2 (880 sq ft)
Empty weight: 17,000 kg (37,479 lb)
Max takeoff weight: 30,500 kg (67,241 lb)
Max payload: 11,500 kg (25,353 lb) at MTOW
Propellers: 6-bladed Dowty Propeller 391/6-132-F/10, 4.15 m (13 ft 7 in)
diameter
Performance
Maximum speed: 602 km/h (374 mph; 325 kn)
Cruise speed: 583 km/h (362 mph; 315 kn)
Minimum control speed: 194 km/h; 121 mph (105 kn)
Range: 1,759 km (1,093 mi; 950 nmi) with MTOW of 30,500 kilograms (67,200 lb)
Range at 6,000 kg payload: 4,130 km (2,230 nmi)
Ferry range: 5,852 km (3,636 mi; 3,160 nmi)
Service ceiling: 9,144 m (30,000 ft)
*
|
|